MATERIALS OF CONSTRUCTION

GENERAL GREY IRON CASTINGS (GRADE A)

Additional Tests.-

The additional tests to be carried out before a casting or batch of castings is rejected shall be in accordance with the following table:-

Test piece
Event
Conditions
1st



2nd




If this fails…………

If this passes……….

It this fails………….

The second test piece shall be tested.

The batch or separate casting represented, shall be accepted.

The batch or separate casting represented may be rejected.

Provided always that in the case of failure of both test pieces if either show obvious defects a third test piece may be taken from a broken casting or a piece may be cut from a usable casting for further testing as follows:-

3rd If this passes………

If this fails…………

The batch or separate casting represented shall be accepted.

The batch or separate casting represented may be rejected.

 